Water Resource Projects

Just click on any of the pictures for larger versions; to view more pictures, click on the Row Numbers.

  • Floodplain on Capitol Creek, Snowmass, CO
    Rhino completed a floodplain delineation boundary of Capitol Creek to establish a building envelope for an owner with property adjacent to the creek. We used FEMA data, specific cross-sectional topography of 8 cross sections and HEC-RAS modeling.
  • Roaring Fork River at Basalt CO Project
    Two-dimensional modeling with FLO-2D software was utilized to determine flow depths, velocities, and flood hazard mapping of properties in the area inundated by the split flow. The final product of this ongoing model will likely result in a revised FEMA Flood Insurance Rate Map.
  • Roaring Fork River at Basalt CO Project
    The flood flow path of the Roaring Fork River through the Town of Basalt was altered by the construction of the Colorado Highway 82 Bypass Bridge. A large amount of the flood flow in the Roaring Fork River splits off from the main channel at this point and flows through a section of the Town of Basalt situated south of the main channel. Due to the complex nature of the flow, previous one-dimensional modeling with HEC-RAS was inaccurate.
  • 14th Street Marketplace, Rifle CO
    Hubbard Gulch is situated just west of Railroad Avenue in Rifle and is a tributary to the Colorado River. A HEC-RAS floodplain and floodway model was first created to match an outdated HEC-2 analysis per FEMA requirements. Utilizing field surveyed cross sections, updated floodplain and floodway models were created for a reach of gulch and were tied into existing cross sections established in the FEMA Floodplain Information Report. These models were all reviewed by FEMA and a LOMR was approved to reflect updated floodplain boundaries on the property.
  • Harrison Creek Project
    The Harrison Creek Project is an environmentally sensitive project that was constructed on undisturbed mountain slopes of eastern Mesa County.
  • Harrison Creek Project
    Two large gas exploration pads and access roads were constructed for operation facilities; the pads were located in a undisturbed wild land drainage basin adjacent to a perennial stream.
  • Harrison Creek Project
    Grading and erosion control plans were designed that detailed intense measures for stormwater management to grant compliance approvals.
  • Harrison Creek Project
Thumbnail panels:
Now Loading


 

1229 N 23rd St., Suite 201
Grand Junction CO 81501
970-241-6027
3312 21st Ave. NW, #312
Minot ND 58703
701-839-1006

©2014 Rhino Engineering, Inc.